Technical Manual for your contractors Follow
Introduction
This article is used to assist contractors in building the venue in preparation for your Gen 3 system. Send your contractors the link to this article.
Information for IT Technicians
Information for Vinyl Installers
Information for Builders
Info
Please follow the architectural plans provided by the project manager or client.
Reception
| Minimum Dimensions | 3.2m x 3m |
| Minimum Ceiling Height | Regulation Ceiling Height |
GM Area
| Minimum Dimensions | 2m x 2m |
| Minimum Ceiling Height | 2.6m |
Briefing Area
| Minimum Dimensions | 3.2m x 3m |
| Minimum Ceiling Height | Regulation Ceiling Height |
Equipment Area
| Minimum Dimensions | 3.2m x 3m |
| Minimum Ceiling Height | Regulation Ceiling Height |
Game Space
| Minimum Dimensions | Rectangle: 16m x 8m Square: 12m x 12m with 80cm pillar in the centre |
| Maximum Dimensions | Rectangle: 20m x 10m Square: 15m x 15m with 1m pillar in the centre |
| Minimum Ceiling Height | 2.6m |
Info
Please confirm with the project manager or client about the exact Game Space size.
Server Area
| Minimum Dimensions | 1.6m x 0.6m |
| Minimum Ceiling Height | Regulation Ceiling Height |
Info
The network equipment should be kept in a consistent ambient temperature of 24 degrees Celsius.
Information for Electricians
Info
Please follow the architectural plans provided by the project manager or client.
Reception
| Number of Power Outlets | 4 |
| Number of Network Points | 1 |
GM Area
| Number of Power Outlets | 8 |
| Number of Network Points | 2 |
Briefing Area
| Number of Power Outlets | 2 |
| Number of Network Points | 1 |
Equipment Area
| Number of Power Outlets | 10 |
| Number of Network Points | 0 |
Info
There can be multiple equipment areas at a venue.
Game Space
| Number of Power Outlets | 0 |
| Number of Network Points | 4 |
Server Area
| Number of Power Outlets | 13 |
| Number of Network Points | (Patch Panel) |
Information for IT Technicians
Internet, Cabling & Wifi Requirements
Minimum 100Mb/s Download and 40Mb/s Upload
UTP CAT 6 Cable Type
- All the network points are to be terminated from the patch panel in the server rack located in the Game Master area to other areas in the venue.
- Each area should be terminated with female CAT6 RJ45 connectors.
2.4Ghz, 5Ghz and 6Ghz
- The Game Space must have less than -60dBm of wireless background Signal to Noise Ratio.
Information for Vinyl Installers
Wall Graphics
| Mandatory | Quantity | Graphic File Size | Recommendation | Links |
| Yes | Enough to cover the perimeter of the Game Space | 20m x 10m or 15m x 15m (cut as required to fit your Game Space) | Printed Mesh or Vinyl Matte | Click here to view the Wall Graphics |
Floor Graphics
| Mandatory | Quantity | Graphic File Size | Recommendation | Links |
| Yes | Enough to cover the Game Space floor | 1.8m x 69m (cut as required for your Game Space) | Vinyl Non-Slip Matte | Click here to view the Floor Graphics |
Info
- It is very important that the graphics are not scaled or stretched in any way. The graphics can be cropped if need be.
- The graphics need to be printed on a non-reflective surface to prevent any tracking issues.
- It is not a big problem if the colours are a little off.
Article Keywords/Phrases:
Information for contractors
Guidelines for builders
Comments
0 comments
Article is closed for comments.