[Dual System] - How to Complete Server Re-labelling and System Re-imaging (For System B) Follow
Warning: This article is for Dual System only.
Introduction
When you first receive both your systems for a Dual Site, they will both be named
and configured to function as two separate systems. This guide will take you
through the process of re-labelling and re-imaging the machines in "System B"
so that they will function within a Dual site.
Time Required
6+ hours
Tools and Equipment Required
- ID Labels from inside Dual System Hardware Kit (ZL-03-17)
- USB Imaging drive, also from the Dual System Hardware Kit (ZL-03-17)
- Computer monitor
- Mouse
- Keyboard
Replace Machine ID Labels
Labels should be placed in the location shown below, making sure to replace only the labels for System B server:
Replace the labels on the System B machines according to the table below:
XX-XX represents your "Primary" site code, and YY-YY represents your "Secondary" (placeholder) site code .
| Machine | Before: (Remove label) | After: New Name (Locate label in kit) |
| CS | YY-YY-CS-01 | XX-XX-CS-02 |
| GM | YY-YY-GM-01 | XX-XX-GM-02 |
| SM | YY-YY-SM-01 | XX-XX-SM-02 |
| SS-01 | YY-YY-SS-01 | XX-XX-SS-09 |
| SS-02 | YY-YY-SS-02 | XX-XX-SS-10 |
| SS-03 | YY-YY-SS-03 | XX-XX-SS-11 |
| SS-04 | YY-YY-SS-04 | XX-XX-SS-12 |
| SS-05 | YY-YY-SS-05 | XX-XX-SS-13 |
|
SS-06 |
YY-YY-SS-06 | XX-XX-SS-14 |
|
SS-07 |
YY-YY-SS-07 | XX-XX-SS-15 |
|
SS-08 |
YY-YY-SS-08 | XX-XX-SS-16 |
|
FH |
YY-YY-FH-01 | XX-XX-FH-02 |
Re-Image System B
Next we need to re-image the machines so that they are named the same as their brand new labels, and also to ensure that they are configured correctly.
For this process you will need:
- USB Imaging drive from the Dual System Hardware Kit (ZL-03-17)
- Each of the computers that need to be re-imaged (see table)
Using the re-imaging drive for this process. Follow the documentation below for each of the computers in the table below.
Ensure that the name entered into the prompt during this process matches the new label that was placed on the machine in the previous step.
NOTE: The imaging process for the Front of House machine (FH) is different to the below documentation.
Documentation: [Re-image Gen3 Machines]
Documentation for the FH machine: [Re-image FH machine]
Replace XX-XX below with your "Primary" site code.
| Machine to be Re-imaged |
| XX-XX-CS-02 |
| XX-XX-GM-02 |
| XX-XX-SM-02 |
| XX-XX-SS-09 |
| XX-XX-SS-10 |
| XX-XX-SS-11 |
| XX-XX-SS-12 |
| XX-XX-SS-13 |
| XX-XX-SS-14 |
| XX-XX-SS-15 |
| XX-XX-SS-16 |
| XX-XX-FH-02 - Note: Imaging process is different. |
Contact Client Services
Once the above steps have been completed, please contact Client Services and let them know you have completed this step, as there are some changes required on the back end.
Article Keywords/Phrases:
Server Renaming
How to update server names
Dual System
Comments
0 comments
Article is closed for comments.